MIB ITALIANA

Case history

Introduction

Post 1945, with the restructuring and development of nations and their industries, ever increasing populations, etc. there was a need for the rapid evolution of large-scale petrochemical, plastics and liquefied gas plants world-wide.

In the 50s and 60s these increases were met utilising the existing pre-war technology and equipment as speed, short turn-arounds and lowest costs where the paramount drivers for everyone.

Safety, the environment, protection of personnel and investments were very much secondary concerns of the day and generally minor considerations. But in the late 1960s, due to increased public awareness, a number of serious accidents and equipment failures, the emphasis of the major oil&gas companies turned to address such critical issues.

The following selection of ‘Case Histories’ explains the involvement of MIB in meeting these new demands and include a brief explanation of the reasons behind them and the advancements they offered.

The Case Histories include:

  • LNG Import & Export Terminal Safety Systems
  • High Pressure Flexible Riser/Umbilical Safety Systems
  • Berantai FPSO Project, Malaysia
  • Marine Breakaway Couplings, Evolution Milestones
  • Tender Assisted Drilling

FSRU TOSCANA

READ MORE

EMERGENCY RELEASE SYSTEMS FOR TENDER ASSISTED DRILLING

READ MORE

MARINE BREAKAWAY COUPLINGS

READ MORE

BERANTAI FPSO PROJECT, MALAYSIA

READ MORE

HIGH PRESSURE FLEXIBLE RISER/UMBILICAL SAFETY SYSTEMS

READ MORE

LNG IMPORT & EXPORT TERMINAL SAFETY SYSTEMS

READ MORE
Contacts
MIB ITALIANA S.P.A
Tel. +39 049 8741272
Fax +39 049 643834
e-mail: info@mibitaliana.it

MIB International Limited c/o Dafferns LLP
Ph. +44 (0) 24 76225202
Fax +44 (0) 24 76221752
e-mail: sales@mibitaliana.it
Work with us